Project Scope
This project will treat the Page Mill / I-280 Interchange which consists of four outer ramps and two inner loop ramps. There will be entrance and exit ramp detours 10:00 AM – 2:00 PM, February 17-20.
The following treatment areas have been separated by jurisdiction between LAHCFD and the City of Palo Alto.
The LAHCFD Jurisdiction:
These portions of the project will treat both sides of the following,
- The South Bound Page Mill Road to North Bound I-280 ramp, approximately 0.3 linear miles
- The South Bound I-280 to Page Mill Road ramp including the left turn lane to North Bound Page Mill Road, approximately 0.5 linear miles
- The on ramp to North Bound I-280 from the inner loop ramp, approximately 0.2 linear miles
- The South Bound Page Mill Road to South Bound I-280 inner loop ramp, approximately 0.2 linear miles
- The western side and center median of South Bound Page Mill Road, approximately 0.3 linear miles
- The southern ends of North Bound Page Mill Road and part of the ramp onto Arastradero Road from North Bound Page Mill Road, approximately 0.1 linear miles
- The southern side of the eastern end of the North Bound Page Mill Road to South Bound I-280 ramp, approximately 0.1 linear miles
Total treatment in LAHCFD jurisdiction: approximately 19 acres
The City of Palo Alto Jurisdiction:
These portions of the project will treat both sides of the following,
- The North Bound I-280 to Page Mill Road ramp including the left turn lane to South Bound Page Mill Road, approximately 0.4 linear miles
- The North Bound Page Mill Road to North Bound I-280 inner loop ramp, approximately 0.2 linear miles
- The North Bound Page Mill Road to South Bound I-280 ramp, approximately 0.2 linear miles
- The on ramp to South Bound I-280 from the inner loop ramp, approximately 0.3 linear miles
- Part of the ramp onto Arastradero Road from North Bound Page Mill Road and from the South Bound I-280 off ramp, approximately 0.1 linear miles
- The eastern side of most of North Bound Page Mill Road, approximately 0.3 linear miles
Total treatment in Palo Alto jurisdiction: approximately 16 acres
Total Project Treated Miles: 5.86